The study area is approximately 3.3 miles long from 3rd Street NE to 33rd Street NW. The EA will evaluate the environmental effects of the reconstruction of the roadway to provide multi-modal and safety improvements. The evaluation of transportation improvements for all modes – streetcar, vehicular, transit, bicycle, and pedestrian – are evaluated to determine the best multi-modal enhancements on the corridor.

Union Station to Georgetown Streetcar Study Area

Section 106 Historic Project Area of Potential Effect

Click here for Zoomable Image
Click here for Zoomable Image
USGT APE 2016

 

USGTstudyarea.pdf

 

 

USGT_APE.pdf

 

ddot.fw  DClogo.fw  FHWA  DOT FTA

Go to top