Preliminary Ridership and Travel Time Analysis

The District Department of Transportation (DDOT) has been advancing technical studies in support of the project and the Environmental Assessment (EA) document being prepared. The attached newsletter presents preliminary travel times and ridership information on the two build alternatives that are under consideration through the newsletter pdf link below.

If you have questions on the information presented in this newsletter or about the USGT project, please contact Jamie Henson, DDOT’s Project Manager at This email address is being protected from spambots. You need JavaScript enabled to view it..

DDOT Staff will also be available before the following ANC meetings in June and July.

ANC Meeting Date Open House ANC Meeting
6E June 6 5:45 PM 6:30 PM
2F June 7 6:15 PM 7:00 PM
6A June 8   7:00 PM
2B
Transportation Committee
June 21   7:00 PM
2A June 21 6:15 PM 7:00 PM
6E
Transportation Committee
June 29   7:00 PM
2E June 29  5:45 PM 6:30 PM
2C July 10 5:45 PM 6:30 PM
6C July TBD    

PDF Download

USGT_Newsletter_06.05.17_8.5x11_Print.pdf

    • This PDF is set up to print on 8.5”x11” sheets of paper.
    • This PDF should NOT be printed on an 11”x17” sheet of paper.

PDF Download

USGT_Newsletter_06.05.17_11x17_Print.pdf

    • This PDF is set up to print double sided on an 11”x17” sheet of paper. The PDF contains two spreads (one for each side of the paper).
    • This PDF should NOT be printed on an 8.5”x11” sheet of paper.

PDF Download

USGT_Newsletter_06.05.17_Web.pdf

    • This PDF is set up for viewing on the web.
    • Because this version is low resolution, it is not intended for printing.

 

 

ddot.fw  DClogo.fw  FHWA  DOT FTA

Go to top